CLOSE

Magee Reiter Automotive Services

Bloomsburg, PA

Project Overview

A series of raised, reinforced, concrete foundations necessary to support a system of production equipment and a jib crane. The installation of the foundations required the removal of the existing concrete floor, the compaction testing of the existing sub-grade to insure stability, placing forms, reinforcing and finally placing 130 CY of concrete. The time required to complete the installation was 10 days, with no interruption of the Owner’s operation.

Service Line:

Industrial/Design Build

Location:

Bloomsburg



Website Support